Civil construction projects require careful planning, execution, and management to ensure successful completion. From the initial excavation to the final touches, every stage in the lifecycle of a civil construction project is crucial. Skilled civil contractors must juggle several tasks and responsibilities to execute the project. This article will provide an overview of the various phases involved in the lifecycle of a civil construction project, highlighting the key milestones and considerations at each stage.
Different phases in the life cycle of a construction project
I. Pre-Construction Phase
Any successful construction project must start with meticulous planning in the pre-construction phase. It involves strategic planning, design development, obtaining required permits, and resource allocation. This approach guarantees strict control over the scope, budget, and timeline.
II. Construction Phase
The construction phase is the physical transformation of a project, involving meticulously planned and executed activities to ensure structural integrity, functionality, and aesthetic appeal, with the civil contractor playing a key role. It is the heart of the life cycle of construction phase and defines project success.
Site preparation and excavation
Every construction project begins with site preparation, which includes clearing and grading the land and compacting the earth. This is a crucial phase since it lays the groundwork for the foundation.
Site preparation depends on the nature and scale of the project. For example, a bungalow will require less preparation than a large commercial building. Site preparation involves:
- Evaluate the site: Conduct a comprehensive evaluation of the location, including soil testing and checking for underground obstructions. Understand the soil’s impact on the project to make informed decisions.
- Survey the site: Hire a surveyor to conduct a site survey using coloured markings or pegs to identify boundary lines. Prepare for the design phase and determine construction permits based on the survey results.
- Create a site plan: After surveying, designers develop a site plan, specifying the location of structures, drainage, and septic systems.
- Create access points: Design access points for construction workers and heavy machinery to ensure smooth operations. Establish perimeter access points for efficient movement around the site.
- Clear the site: Access the site and proceed to clear it, including the demolition of any existing structures.
- Install drainage and erosion systems: Before construction, implement proper land management measures.Install drainage systems and consider groundwater control, using tools like retention ponds. Employ a silt fence to trap loosened soil, preventing runoff into roads and sewers.
- Grade and compact the Site: Execute grading and compacting processes, essential for new building projects. Employ methods like “cut and fill” and “split level” for earthwork landscaping. Compact the ground to ensure stability for foundation support, promoting a secure construction environment.
Foundation and Structural Work
The foundation, situated beneath the building, is its lowest part. It ensures the structure’s strength to support the building’s weight and endure design loads. Constructing the foundation involves placing footings, slabs, and beams, using concrete forms, rebar, and equipment for concrete mixing and pouring. This process establishes a robust foundation for overall structural stability. Explore our structural fabrication blog here
Building Envelope and Exterior Work
The building envelope and exterior work are crucial stages in construction, shaping visual identity and ensuring aesthetic appeal and structural integrity. Contractors must work with engineers and architects at this stage to ensure the building is constructed as per specifications. Some of the work included in this stage includes:
- Material procurement
- Building walls, roof, etc.
- Waterproofing and weatherproofing
- Exterior Finishes.
- Roofing
- Fenestation (installing windows and doors)
- Insulation.
Mechanical, Electrical, and Plumbing (MEP) Systems
Once the building envelope is completed, the focus shifts to mechanical, electrical, and plumbing (MEP) systems. These systems help to ensure the building is habitable and suitable for human use and occupancy.
- Heat, ventilation, and air conditioning control systems (HVAC) for ventilation and climate control.
- Electrical wiring, lighting, and communication systems for power and connectivity
- Plumbing systems for water supply, drainage, and sanitary systems
Want to learn more about MEP (Mechanical, Electrical, and Plumbing) systems? Read here.
Interior finishes and architectural detailing
- Interior finishes include flooring, wall finishes, ceiling finishes, and millwork. Flooring materials like wood, tile, carpet, or vinyl enhance the design aesthetic and functionality of each space. Wall finishes include painting, wallpaper, drywall, acoustic panels, and other materials. Ceiling finishes include drywall, acoustic panels, and lighting.
- Architectural detail includes installing interior doors, moulding, trim, lighting fixtures, plumbing fixtures, and appliances to enhance the aesthetics and functionality of spaces. Lighting fixtures provide adequate illumination, create ambience, and enhance the overall design. Plumbing fixtures enhance functionality and user experience.
This is a snapshot of the time and equipment required in the various phases of a construction stage.
Phase | Average time required | Tools |
---|---|---|
Site preparation and excavation | 1 Month | Excavator, roller, dumper etc. |
Foundation and Structural Work | 2-3 Month | Tower Crane, Concrete Mixer, Vibrator, cutting machine, bending machine, Water pump, Concrete pump etc. |
Building Envelope and Exterior Work | 3-6 Month | Tower crane, Cutting machine, Water pump etc. |
Mechanical, Electrical, and Plumbing (MEP) Systems | 1-2 Month | |
Interior Finishes and Architectural Detailing | 3-4 Month |
Post-commissioning stage
The post-construction phase is the final stage of the life cycle of construction project, ensuring its completion and proper functioning before handover to the owner.
- Final inspections are thorough checks to identify any outstanding issues or non-compliances, ensuring the project adheres to all agreed-upon standards and specifications.
- Commissioning involves the rigorous testing and calibration of MEP systems, including HVAC, electrical circuits, plumbing systems, and other critical components, to ensure efficient and safe operation.
- Contractors offer warranties and guarantees on their work to resolve any defects or issues within a specified timeframe.
- The project is officially handed over to the owner after completing outstanding issues, such as providing manuals, warranties, keys, and training on building system operation and maintenance.
Venwiz: Trustworthy online platform for Industrial services
It is challenging to find reliable contractors for your business. Venwiz is a comprehensive platform that aims to simplify industrial service procurement, connecting businesses with over 16,000 vendors. We proudly present one of the leading civil construction vendors on our platform, Unnati Construction Pvt. Ltd.
Legacy of 18 years: Unnati Construction Pvt. Ltd
Unnati Construction Pvt. Ltd. is a leading construction company in India with over 18 years of experience. Since its inception, the company has delivered high-quality work, setting the benchmark for excellence in the industry.
The company has ISO 9001:2015 certification, showing its commitment to quality and continuous improvement.
Unnati believes in the safety of its employees and implements the best safety practices in every stage of the project. It was awarded ISO 45001: 2018 certification for occupational health and safety (OH&S) management systems.
Some of the standout projects at Unnati include:
S.no | Client name | Industry/Sector | Project Description | Project images |
---|---|---|---|---|
1 | Alfa Biomed Pvt. Ltd. Pune | Pharma | Construction of a greenfield project for the manufacturing plant of generic medicine with a warehouse and utilities valued at 80.43 crore INR. | |
2 | Tulip Bioshield Ltd., Goa | Pharma | Construction of Greenfield project of Ground + 3 floors Manufacturing plant of value 24.50 crore INR. | |
3 | Ajanta Pharma Ltd., Mumbai | Pharma | Construction of greenfield project of 2 Basement+ Ground + 9 floors of a corporate office with a value of 36.50 crore INR. |
Guest Author
Mr Shashikant Shripati Phadtare is the GM of Contracts at Unnati Constructions. He has over 23 years of experience in the industry. A civil engineer by profession, Mr Phadtare has been committed to high-quality standards and customer satisfaction at Unnati.
Venwiz: Your Gateway to Unmatched Business Success
- For Clients: Access a vast network of pre-vetted vendors, experience seamless vendor management, and drive project success with Venwiz.
- For Vendors: Discover high-value clients, improve brand visibility, and grow your business with Venwiz. Partner with us today to unlock a world of possibilities.
If you need any other information, contact us at marketing@venwiz.com or call +91 8950512288 today.