Vewniz logo image
×

Request a call back

We will call you to schedule a demo at your convenience.

What is the difference between the Brownfield vs. Greenfield project?

What is the difference between the Brownfield vs. Greenfield project_ -focus image

Are you launching your industrial project? One approach is brownfield, where you redevelop or reuse an existing project, and the other is greenfield, where you start from scratch. Choosing between these brownfield vs. greenfield projects will shape your venture. It’s crucial to grasp the advantages and pitfalls inherent in each approach. Let us delve into the intricacies of brownfield and greenfield projects, which will help you make this critical decision and ensure the success of your industrial venture.

Table of Contents

What are greenfield projects?

what are greenfield project?/ greenfield vs. brownfield projects
A beautiful shot of a field with white clouds in a clear sky

A greenfield project refers to a project that is built on underdeveloped land or a site that has no existing infrastructure or prior work constraints. There are no limitations or dependencies on the existing system or facility from the ground up. Let’s explore the advantages and disadvantages of this approach to see if it’s the right fit for your next venture.

Want to learn more about strategies to implement successful greenfield project?

Advantages

  • Adopt modern practices: Greenfield projects allow us to use cutting-edge technologies like AI, robotics, and IIOT, fostering a future-proof environment.  A World Economic Forum report highlights that greenfield projects adopting AI and robotics can experience a 40% increase in production capacity (WEF, 2023).
Greenfield project adv
  • Adopt modern practices: Greenfield projects allow us to use cutting-edge technologies like AI, robotics, and IIOT, fostering a future-proof environment.  
  • Prioritize safety: Greenfield projects allow you to prioritise safety from the beginning.  According to research conducted by the International Labour Organisation, greenfield projects offer a safety advantage by enabling the design from scratch, leading to inherent risk mitigation and a potential 25% reduction in workplace accidents compared to brownfield sites (ILO, 2022).
Greenfield adv 2 in brownfield vs. greenfield project

Drawbacks

  • Higher initial investment: Building infrastructure from scratch will entail higher upfront costs.
  • Extended lead time: Greenfield projects frequently need longer to execute than brownfield ones. 
  • Unexpected challenges: Greenfield projects can present unforeseen challenges, including complicated logistics, environmental issues, and land acquisition problems. Stanford University School of Engineering research reveals that 20% of greenfield projects encounter unanticipated difficulties (Stanford University, 2022).
  • Limited historical data: As greenfield projects are entirely new, they lack historical data on maintenance, performance, and reliability. Forecasting long-term operating expenses and identifying potential problems may be challenging due to this absence of data.

What are brownfield projects?

Brownfield projects involve repurposing or enlarging preexisting structures or infrastructure. Unlike greenfield projects, which start from scratch, brownfield projects leverage pre-existing structures to maximize resource utilization and often require modernization adjustments.

Advantages

  • Cost-effective choice:  Existing infrastructure, such as buildings, utilities, and transportation, can substantially reduce upfront costs. This can translate to potentially freeing up the budget for critical areas like technical infrastructure and improving operational efficiency. A World Bank study estimates a 20–30% reduction in initial investment due to leveraging existing infrastructure like buildings, utilities, and transportation networks (World Bank, 2021).
brownfield adv 1- brownfield vs. greenfield project.
  • Availability of historical data: Brownfield projects benefit from historical data on the maintenance, performance, and reliability of existing infrastructure. This data helps you make more informed decisions, mitigate risks, and ensure smoother operations.
  • Faster implementation: Utilizing existing infrastructure can shave months off your project schedule, enabling quicker product launches, faster time-to-market, and potentially gaining a competitive edge. Research from the Project Management Institute indicates that you can complete brownfield projects 12–18 months faster than their greenfield counterparts (PMI, 2023).
brownfield adv 2- brownfield vs. greenfield project.

Difference between a brownfield vs. greenfield project 

FeatureBrownfield ProjectGreenfield Project
Initial Investment1. Upgrades or modifications. (15-20% cheaper than GF)
2. New lines/capacity addition  (5–10% cheaper than GF)
Higher
Modernization PotentialLowHigh
SafetyCan be improvedHigh
Unforeseen ChallengesHighLow
Historical dataLimitedAvailable

5 Key Factors to Consider When Choosing Between Brownfield vs. Greenfield Project

Choosing between a greenfield vs. brownfield project is a critical decision for a stakeholder. We have already highlighted the advantages and disadvantages,  and your decision finally depends on your specific project goals and constraints. Here are key factors that will help you make an informed decision:

Site Availability and Location

Site Availability-1 Factors to Consider When Choosing Between Brownfield vs. Greenfield Projects
  • Greenfield: This involves developing a project on untouched property that may be located in rural areas or on the outskirts of cities. You can have access to space and lower land costs, but you might lack existing infrastructure and have longer commutes. The proximity to transportation hubs, suppliers, and markets becomes crucial for successful implementation.
  • Brownfield: involves the redevelopment of existing sites within urban or industrial areas. This choice capitalizes on established infrastructure and closer proximity to resources. However, challenges like zoning restrictions and potential environmental issues may disrupt timelines and budgets, requiring careful consideration and mitigation strategies.

Cost and Time

cost - Factors to Consider When Choosing Between Brownfield vs. Greenfield Projects
tax payment document clock time vector illustration
  • Greenfield: Higher upfront investment and longer lead times are associated with building everything from scratch. Despite the added cost, this approach offers control and flexibility. Ensure you factor in land acquisition costs, infrastructure development, and potential delays in your planning.
  • Brownfield: Savings in cost and time are realized through existing infrastructure. However, be aware of hidden costs such as environmental cleanup, upgrades, and unforeseen problems that may arise. In your planning, factor in the remediation budget, retrofitting expenses, and potential timeline extensions.

Environmental Impact

environmenta - Factors to Consider When Choosing Between Brownfield vs. Greenfield Projects
The forest and the trees are in the light. Concepts of environmental conservation and global warming plant growing inside lamp bulb over dry soil in saving earth concept
  • Greenfield : This involves developing on untouched land with a potentially lower environmental impact. However, this may disturb the natural ecosystems, and careful consideration is needed to mitigate any negative effects. You have the flexibility to adopt sustainable practices and reduce the carbon footprint of your project. 
  • Brownfield: This involves the redevelopment of previously used land, and may require environmental redemption. While existing infrastructure may minimize the need for new construction, the project must address potential contamination and environmental challenges. 

Infrastructure and Access

infrasturcture -Factors to Consider When Choosing Between greenfield v s. brownfield project.
  • Greenfield: Prepare to construct roads, utilities, and amenities from scratch. Assess the availability and accessibility of these services, as they can significantly impact project schedules and deliveries.
  • Brownfield: Utilize existing infrastructure for expedited project delivery and reduced costs. Evaluate the condition of the existing infrastructure and assess its suitability for the project.

Flexibility and Innovation

  •  Greenfield: Offers greater flexibility and opportunities for innovation since there are no pre-existing constraints or limitations. Embrace cutting-edge technologies and design freedom to create a state-of-the-art facility.
  • Brownfield: May have limitations based on existing structures and systems, making it more challenging to adopt new technologies and processes. Assess the extent to which existing infrastructure allows for innovation

Stages of Brownfield and Greenfield Projects

Whether you are executing brownfield or greenfield project, the execution stage will be similar. The stages can be broadly classified into:

Planning and Engineering

This crucial stage lays the foundation. Feasibility studies assess project viability, approvals are secured, and engineering consultants are chosen. The project takes shape with basic design, detailed planning, and budgeting. Consultants finalize detailed RFQs (Request for Quotations) outlining project requirements.

Procurement 

With finalized RFQs, the search for vendors begins. Project Management Consultants (PMCs) may add vendors for client approval. RFQs are shared with shortlisted vendors, followed by technical and financial evaluations by the PMC and client team. Negotiation and vendor finalization complete this stage, ensuring the right partners are on board.

Execution 

The action takes centre stage. Project teams and PMCs collaborate on-ground with vendors, closely monitoring progress and adapting as needed. This dynamic phase involves resolving challenges, ensuring quality, and meeting deadlines. Finally, project closure marks the successful completion of the journey from vision to reality.

Navigating the complex world of industrial projects just got easier with Venwiz, India’s leading digital platform for discovering and procuring the best service vendors. Whether initiating a greenfield venture or revitalizing a brownfield facility, Venwiz empowers you with reliable partners and a seamless procurement process.

Venwiz Advantage for brownfield and greenfeld projects

How can Venwiz provide value for a brownfield or greenfield project?

Planning and Engineering:

  • Curated Consultants: Find the perfect engineering partner for your project’s specific needs. 
  • Early Vendor Discovery: Discuss requirements with potential vendors before finalizing RFQs, ensuring a clear roadmap.
  • Digital Procurement Scheduler: Use our intuitive tool to build a streamlined plan with clear timelines and responsibilities for each stage.

Procurement:

  • Expand Your Vendor Pool: Access a diverse network of qualified vendors beyond your usual choices, increasing competition and potentially lowering costs.
  • Effortless RFQ Management: Generate and manage RFQs seamlessly with our real-time eRFx tool, saving you valuable time and effort.
  • Detailed Comparisons: Get detailed technical, financial, and pricing comparisons to make the best choices for your project.
  • Faster Procurement: Reduce delays with our Procurement Planner tool and centralized reverse auctions, accelerating your project timeline.

Execution:

  • Clear Milestones: Define clear goals, assign ownership, and track progress effectively with our collaborative tools.
  • Vendor Communication Hub: Bridge communication gaps and ensure everyone is on the same page with our user-friendly platform.
  • Real-Time Visibility: Get a single-window view of vendor progress on all purchase orders, allowing for proactive decision-making.
  • Transparent Management: Maintain complete transparency throughout the project with comprehensive audit trails and reporting.
Venwiz engagement for greenfield/brownflield projects


Don’t let vendor headaches stall your industrial dreams. Venwiz is your one-stop shop for navigating brownfield or greenfield projects with confidence. From expert consultants to real-time execution visibility, we empower you to find the best vendors, optimize costs, and achieve success, faster. Partner with Venwiz and unlock your project’s full potential.

Conclusion

In conclusion, while both greenfield and brownfield approaches have their merits, the Indian landscape presents unique challenges that make brownfield projects a compelling choice for many industries. Convenience plays a major role, with brownfield projects bypassing the often lengthy and complex land acquisition and approval processes that can significantly delay and inflate costs. Additionally, the potential for negative public opinion towards new plants in their vicinity is minimized, fostering a more community-friendly approach.

Ultimately, the decision between a greenfield vs. brownfield project hinges on your specific project needs. However, in the Indian context, where speed, cost-efficiency, and community considerations hold significant weight, brownfield projects offer a strategic advantage. It’s a path paved not just with convenience, but with the potential for sustainable and responsible industrial success.

Visit our website for more information or contact us: contact@venwiz.com.

Register or log in to our platform for all your capex procurement requirements.

For further insights into the latest developments in the manufacturing sector, visit our LinkedIn page.

Related Blogs

Book a demo

We will call you to schedule a demo at your convenience.

Scroll to Top
Venwiz logo layer 1

© 2023 Venwiz

Access our Case Studies with a simple Sign up!

Interested in a vendor?

Please fill the form below for a callback.

Interested in a vendor?

Please fill the form below for a callback.

Thank you!

A message has been sent successfully. Our team will get in touch with you soon!